1 Commits
Author SHA1 Message Date
Clawdia c25837d63e Add FINDINGS-2026-09-04.md: project state and open items
Preserves a canonical snapshot of the current repo, plugin, and live
Gateway state so progress is not lost while the project is paused. No
code or runtime state was changed. No live MeshCentral calls.

- Documents 3 merged PRs (#1 transport, #2 plugin, #3 target matching).
- Notes all local verification gates are green.
- Notes the running Gateway plugin is the pre-PR#3 build; rebuild pending.
- Notes the prior live PVE3 status call result was not recorded.
- Lists stale docs (PROJECT-PROGRESS.json, TODO.md, RESUME-HANDOFF.md)
  that still describe an earlier unmerged state.
- Recommends a resume order: docs PR, plugin rebuild+reinstall, live
  verification, then mark MVP complete.

Refs: chat log from 2026-09-03 evening session.
2026-09-04 10:14:05 -04:00